Home | Sitemap | Korean
 

Results and targets of power generation
 
(Unit : GWh, %)
Classification Result of 2008 Target for 2009
Quantity Generated Proportion Quantity Generated Proportion
Steam
Power
Anthracite
Coal
Seocheon Thermal
P/P
2,007 4.82 2,827 5.78
Bituminous
Coal
Boryeong Thermal
P/P
26,628 64.01 30,758 62.95
Crude Petroleum
Oil
Jeju Thermal
P/P
983 2.36 1,129 2.31
LNG Seoul Thermal
P/P
895 2.15 958 1.96
Incheon Thermal
P/P
623 1.50 312 0.64
Total 31,135 15.06 6,518 13.34
Combined - Cycle LNG Boryeong C.C P/P 6,265 8.40 5,774 11.82
Incheon C.C P/P 3,495 9.08 3,638 8.30
Hydraulic power Yangyang Pumped-Storage P/P 687 1.65 553 1.13
Yangyang Small Hydro Power 3.8 0.01 5.0 0.01
Boryeong Small Hydro Power 3.2 0.01 19.2 0.04
Wind Power Yangyang Wind Power 4.8 0.01 3.1 0.01
Photovoltaic Power Seocheon PV Power 1.6 0.004 1.6 0.003
Boryeong 0.4 0.001 0.7 0.001
Jeju 0.1 0.0001 0.1 0.0001
Fuel Cell Power(NG) Boryeong 0.7 0.002 2.1 0.004
Total 41,597 100.00 48,860 100.00